Search the field guide, causes, requirements, and glossary

Tools

Planning tools, each built to answer one question well.

What is most likely causing this drop?Disconnect triageDescribe how the drop presents. Get a ranked list of likely causes, the answers that pointed to each, and what to capture next.Open disconnect triageHow long an outage can this connection survive?Timing budgetTurn the application's timeout into the longest outage it tolerates, see which roams fit, and see the cost in distance.Open timing budgetWhat must the wireless design deliver for this link?Requirements translatorPick what rides the link, the vehicle, and the environment. Get the outage budget, whether your roam fits, the vehicle's published requirements, and the design rules.Open requirements translatorHow many vehicles fit on one channel?Fleet capacityDescribe each vehicle's traffic and the radio. Get the airtime it takes, frame by frame, and how many vehicles fit under your utilization ceiling.Open fleet capacityHow do I prove the worst case fits?Acceptance test planStart from your spec. Get a test plan with prerequisites, routes, traffic, a duration sized to the failure rate you need to rule out, what to capture, and pass lines.Open acceptance test planWhere are the gaps in how we run wireless?Readiness assessmentAnswer short questions on requirements, design, validation, operations, and incident response. Get a score per area and your gaps in priority order.Open readiness assessment

Print and copy

How they work